homeCurrent Project

  • Villa Images

Villa at Peruvayal

Villa at Peruvayal

Foundation & basement

Random Rubble masonry PCC if required


Structure

Laterite Stone Masonry


Roof Slab

Reinforced Cement Concrete


Flooring

Vitrified Tiles Rak/Kajaria or equivalent


Step & Stair

Lapatro Granite


Doors

Front door- Teak wood Bed rooms - Flush door with veneer finish Toilet doors - Flush door with laminate finish.


Windows

UPVC windows with SS Mosquito mesh and MS Grille.


Kitchen

Rustic tiled flooring ; polished granite top with glazed-tile to 45cm from counter-top, stainless steel sink with drainboard.


Toilet

High quality anti-skid tiles on the floor and ceramic tiles on the walls up to 7 ft height.


CP & Sanitary fittings

Kohler, Vitra, Roca, American Standard or equivalent.


Painting

Putty finished emulsion paint for Interior; anti-fungal weather coat paints for exteriors.


Electrical

Concealed copper wiring through PVC conduits using insulated wire from RR/Polycab/Havells or equivalent, modular switches from Legrand/ Havells of equivalent controlled by ELCB and MCB. TV and telephone points in living room and master bedroom, A/C point in all bedrooms, provision for inverter, KSEB connection as per the regulations of KSEB.


Children Play Area

Swimming Pool & Kids Pool

Street Lighting

Club house – Gym & Indoor games

16.5ft, 13ft, 11.8ft width internal road

Recreation Area

Overhead watertank

Landscaped Gardens

24 hrs Electricity backup for common area

Security Entrance (Security & CCTV Cameras)

Underground Electrification

Underground Drainage

  • All payments are to be made as per schedule of payments provided in the price list. ‘Conmate’ Builders & Developers Pvt. Ltd. Reserves the right to change, without notice, the price and schedule of payment before allotment is confirmed. Once the allotment is confirmed price is firm.
  • GST, Stamp duties, Fees and other expenses incidental to the registration of the documents, K.S.E.B. / K.W.A deposits, Transformer and underground cable distribution charges and other expenses incidental to power and lighting connection, water and drainage, connection charges, telephone cabling expenses, building tax, property tax and other taxes applicable, contribution towards Kerala Construction Workers Welfare fund, one-time building tax and other statutory charges shall be met by the applicant. However, no responsibility shall be accepted for any delay beyond company’s control in obtaining these services from statutory bodies and applicant shall meet any expenses incurred for providing temporary supplies for the occupation of the premises and it has to be proportionately along with the instalments towards above costs.
  • Dimensions and details provided in the accompanying literature are approximate and are subject to alteration without notice.
  • Till the formation of the Owners Association which will takeover the maintenance, the builder will carry out the maintenance, utilizing the deposits collected from all the owners after meeting the expenses, the balance will be transferred to the Owners Association.
  • The imagery used in the page is indicative of style only. The photographs of the interior surrounding views and locations may have been digitally enhanced or altered and do not represent actual views or surrounding views. The furniture and fittings shown in the picture are only indicative in nature and not a part of the offered sale unit.

Comfort beyond borders

Back to Top